New Geithus Bridge — Turnkey Contract

Information

02 - Meddelande om upphandling
Öppet förfarande
2020-01-20 09:37 (GMT+01:00)
2020-02-27 12:00

Inköpare

Modum kommune Modum kommune
Tor Kristian Kristiansen
Rådhusveien 1
3370 Vikersund
Norge
970491589

Anbudsfristen har passerat.

Kort beskrivning

The contract includes the construction of a new Geithus bridge over the Drammen river/the lake mouth from Bergsjø. The contract includes: — readjustment for a new road/new crossing for the new bridge, — alteration of the current bridge to foot and cycle paths, — removal of a suspended foot path on the current bridge, — renovation of other structures, — construction of an approx. 430 m long new foot and cycle path, parallel with the main road, — access roads on both sides of the river, — readjustment for the current and new technical pipes and conveyance paths in the ground that is affected by the measures, — lighting for the current bridge, the new bridge and roads.

Mercell Commerce

Del av Mercellgruppen, en av Europas ledande leverantörer av elektroniska upphandlings- och anbudssystem på den professionella marknaden.

Kontakta oss

Klicka här för att gå till vår support

+46 077 144 02 00
Mercell Commerce | Lindhagensgatan 94, 11218 Stockholm, Sverige