New Geithus Bridge — Turnkey Contract

Hange

02 - Contract notice
Avatud menetlus
20.01.2020 10:37 (GMT+02:00)
27.02.2020 12:00

Hankija

Modum kommune Modum kommune
Tor Kristian Kristiansen
Rådhusveien 1
3370 Vikersund
Norra
970491589

Hange on lõppenud

Hanke lühikirjeldus

The contract includes the construction of a new Geithus bridge over the Drammen river/the lake mouth from Bergsjø. The contract includes: — readjustment for a new road/new crossing for the new bridge, — alteration of the current bridge to foot and cycle paths, — removal of a suspended foot path on the current bridge, — renovation of other structures, — construction of an approx. 430 m long new foot and cycle path, parallel with the main road, — access roads on both sides of the river, — readjustment for the current and new technical pipes and conveyance paths in the ground that is affected by the measures, — lighting for the current bridge, the new bridge and roads.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti