New Geithus Bridge — Turnkey Contract

Hankinnan yleistiedot

02 - Hankintailmoitus (2)
Avoin menettely
20.1.2020 10.37 (GMT+02:00)
27.2.2020 12.00

Hankintayksikkö

Modum kommune Modum kommune
Tor Kristian Kristiansen
Rådhusveien 1
3370 Vikersund
Norja
970491589

Määräaika on umpeutunut

Lyhyt kuvaus

The contract includes the construction of a new Geithus bridge over the Drammen river/the lake mouth from Bergsjø. The contract includes: — readjustment for a new road/new crossing for the new bridge, — alteration of the current bridge to foot and cycle paths, — removal of a suspended foot path on the current bridge, — renovation of other structures, — construction of an approx. 430 m long new foot and cycle path, parallel with the main road, — access roads on both sides of the river, — readjustment for the current and new technical pipes and conveyance paths in the ground that is affected by the measures, — lighting for the current bridge, the new bridge and roads.

Mercell Suomi Oy

Osa Mercell-ryhmää, Euroopan johtavaa hankintapalvelujen sekä sähköisen kilpailutusjärjestelman tuottajaa.

Yleistä hankinnoista

Hankintalaki
TED

Yhteydenotto

Klikkaa tästä asiakaspalveluun

+358 207 528 600