New Geithus Bridge — Turnkey Contract

Information

02 - Udbudsbekendtgørelse
Offentligt udbud
20-01-2020 09:37 (GMT+01:00)
27-02-2020 12:00

Indkøber

Modum kommune Modum kommune
Tor Kristian Kristiansen
Rådhusveien 1
3370 Vikersund
Norge
970491589

Tidsfristen er overskredet

Kort beskrivelse

The contract includes the construction of a new Geithus bridge over the Drammen river/the lake mouth from Bergsjø. The contract includes: — readjustment for a new road/new crossing for the new bridge, — alteration of the current bridge to foot and cycle paths, — removal of a suspended foot path on the current bridge, — renovation of other structures, — construction of an approx. 430 m long new foot and cycle path, parallel with the main road, — access roads on both sides of the river, — readjustment for the current and new technical pipes and conveyance paths in the ground that is affected by the measures, — lighting for the current bridge, the new bridge and roads.

Mercell A/S

En del af Mercell, en af Europas ledende aktører inden for formidling af information mellem indkøber og leverandør på det professionelle marked. CVR nr. 25698851

Kontakt

Klik her for at gå til support

+45 63 13 37 00
Mercell A/S | B!NGS
Vesterbrogade 149
, 1620 København V, Danmark