New Oil Terminal

Information

04 - Periodiskt meddelande – försörjningssektorerna
Förhandlat förfarande
2018-11-06 09:37 (GMT+01:00)
2018-12-03 23:59

Inköpare

Frederikshavn Havn Frederikshavn Havn
Sekretariatet
Oliepieren 7
9900 Frederikshavn
Danmark
35431926

Anbudsfristen har passerat.

Kort beskrivning

The Port of Frederikshavn is planning to build a new oil terminal and put out the work for tender in a turn key contract including design, construction and commissioning. It is expected that the work will commerce in the first quarter of 2019 and that the finished oil terminal must be ready for use in the fourth quarter of 2020. The overall plant must as a minimum comprise: — tank farm with 11 tanks and a total capacity of 74 400 m — 2 berth loading facilities at the quay, — 1 truck loading facility, — piping systems including pumps and pumping room, — central heating system for heating of some of the tanks, — vapour return system with filter, — drain systems, — electrical installations and SCADA system, — personnel facilities, — workshop, — 2 guardhouses or similar, — storage areas for EMSA equipment, — fences and gates.

Mercell Commerce

Del av Mercellgruppen, en av Europas ledande leverantörer av elektroniska upphandlings- och anbudssystem på den professionella marknaden.

Kontakta oss

Klicka här för att gå till vår support

+46 077 144 02 00
Mercell Commerce | Lindhagensgatan 94, 11218 Stockholm, Sverige