New Oil Terminal

Information

04 - Periodic indicative notice - utilities
Verhandlungsverfahren
06.11.2018 09:37 (GMT+01:00)
03.12.2018 23:59

Buyer

Frederikshavn Havn Frederikshavn Havn
Sekretariatet
Oliepieren 7
9900 Frederikshavn
Dänemark
35431926

Closing date has passed.

Short description

The Port of Frederikshavn is planning to build a new oil terminal and put out the work for tender in a turn key contract including design, construction and commissioning. It is expected that the work will commerce in the first quarter of 2019 and that the finished oil terminal must be ready for use in the fourth quarter of 2020. The overall plant must as a minimum comprise: — tank farm with 11 tanks and a total capacity of 74 400 m — 2 berth loading facilities at the quay, — 1 truck loading facility, — piping systems including pumps and pumping room, — central heating system for heating of some of the tanks, — vapour return system with filter, — drain systems, — electrical installations and SCADA system, — personnel facilities, — workshop, — 2 guardhouses or similar, — storage areas for EMSA equipment, — fences and gates.

Mercell Germany

Part of the Mercell Group, one of Europe’s leading providers of e tender systems and information between buyers and suppliers in the professional market.

Contact us

Write to us

+47 21 01 88 60
Mercell Germany | Askekroken 11, 0277 OSLO, Norwegen