Geotechnical investigations, Lillebælt Syd Nearshore Wind Farm

Information

Förhandlade förfaranden under konkurrens
2017-12-23 09:19 (GMT+01:00)
2018-01-23 14:00

Inköpare

Sønderborg Affald A/S Sønderborg Affald A/S
Betina Hylleberg Skjøth Betina Hylleberg Skjøth
Ellegårdvej 8
6400 Sønderborg
Danmark
31875560

Anbudsfristen har passerat.

Kort beskrivning

The purpose of the works is to carry out and document offshore geo-technical investigations at the site of Lillebælt Syd nearshore wind farm of 20 to 44 wind turbines of 3.6 MW – 8 MW each. The total installed capacity is up to 160 MW. The foundations can either be monopiles, gravity based foundations or suction buckets (to be determined). The work is part of the initial investigations alongside an environmental impact assessment.

The objective of the works is to verify the ground conditions investigated by the geophysical survey and to establish design parameters for the geo-technical design of the foundations.

The final reporting is in May, 2018.

Mercell Commerce

Del av Mercellgruppen, en av Europas ledande leverantörer av elektroniska upphandlings- och anbudssystem på den professionella marknaden.

Kontakta oss

Klicka här för att gå till vår support

+46 077 144 02 00
Mercell Commerce | Lindhagensgatan 94, 11218 Stockholm, Sverige