Geotechnical investigations, Lillebælt Syd Nearshore Wind Farm

Hange

Competitive procedure with negotiation
23.12.2017 10:19 (GMT+02:00)
23.01.2018 14:00

Hankija

Sønderborg Affald A/S Sønderborg Affald A/S
Betina Hylleberg Skjøth Betina Hylleberg Skjøth
Ellegårdvej 8
6400 Sønderborg
Taani
31875560

Hange on lõppenud

Hanke lühikirjeldus

The purpose of the works is to carry out and document offshore geo-technical investigations at the site of Lillebælt Syd nearshore wind farm of 20 to 44 wind turbines of 3.6 MW – 8 MW each. The total installed capacity is up to 160 MW. The foundations can either be monopiles, gravity based foundations or suction buckets (to be determined). The work is part of the initial investigations alongside an environmental impact assessment.

The objective of the works is to verify the ground conditions investigated by the geophysical survey and to establish design parameters for the geo-technical design of the foundations.

The final reporting is in May, 2018.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti