E6 Drainage works Hvam — Gardermoen N, Skedsmovollen — Grankrysset.

Hange

Ei kohaldata
08.11.2016 10:41 (GMT+02:00)
14.02.2017 12:00

Hankija

Statens vegvesen Region øst (The Norwegian Public Roads Administration, Eastern Region) Statens vegvesen Region øst (The Norwegian Public Roads Administration, Eastern Region)
Development, Romerike Development, Romerike
Kanirash Kamran
Postboks 1010
2605 Lillehammer
Norra
971032081

Hange on lõppenud

Hanke lühikirjeldus

The works mainly consist of renovation of old surface water pipelines (excavating and replacing) on both sides of the E6 between Skedsmovollen in Skedsmo municipality and Grankrysset in Sørum municipality. The section has a length of approx. 4.4 km and crosses several gully valleys.

Replacement of manholes and pipes, service pipes and drainage system. Renovation of hose cover where this is described.

Necessary securing work with sheet piling and relieving measures are included where the ground conditions require this. The estimated scopes are approx. 2 200 m pipe renovation by using pipe lining.

The work is drawing based with tables. Pipe inspections have been carried out and condition reports have been prepared. Ground surveys are available for the stretch, which were carried out when the motorway was constructed. There may have been some ground levelling by ground owners in some areas.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti