E6 Drainage works Hvam — Gardermoen N, Skedsmovollen — Grankrysset.

Information

Finder ikke anvendelse
08-11-2016 09:41 (GMT+01:00)
14-02-2017 12:00

Indkøber

Statens vegvesen Region øst (The Norwegian Public Roads Administration, Eastern Region) Statens vegvesen Region øst (The Norwegian Public Roads Administration, Eastern Region)
Development, Romerike Development, Romerike
Kanirash Kamran
Postboks 1010
2605 Lillehammer
Norge
971032081

Tidsfristen er overskredet

Kort beskrivelse

The works mainly consist of renovation of old surface water pipelines (excavating and replacing) on both sides of the E6 between Skedsmovollen in Skedsmo municipality and Grankrysset in Sørum municipality. The section has a length of approx. 4.4 km and crosses several gully valleys.

Replacement of manholes and pipes, service pipes and drainage system. Renovation of hose cover where this is described.

Necessary securing work with sheet piling and relieving measures are included where the ground conditions require this. The estimated scopes are approx. 2 200 m pipe renovation by using pipe lining.

The work is drawing based with tables. Pipe inspections have been carried out and condition reports have been prepared. Ground surveys are available for the stretch, which were carried out when the motorway was constructed. There may have been some ground levelling by ground owners in some areas.

Mercell A/S

En del af Mercell, en af Europas ledende aktører inden for formidling af information mellem indkøber og leverandør på det professionelle marked. CVR nr. 25698851

Kontakt

Klik her for at gå til support

+45 63 13 37 00
Mercell A/S | B!NGS
Vesterbrogade 149
, 1620 København V, Danmark