330 kV, 30 kV cable line installation in Kelme 2 and Kelme 3 Wind farm projects

Information

2023-05-30 12:56 (GMT+02:00)
2023-06-16 22:00 (GMT+02:00)
2023-06-12 11:00 (GMT+02:00)
2023-06-12 11:00 (GMT+02:00)
Nej
Nej

Inköpare

Enefit Green UAB Enefit Green UAB
Andrius Venckūnas Amanda Nagevičiūtė
Olimpiečių g. 1-40
LT-09235 Vilnius
Litauen
305039259

Anbudsfristen har passerat.

Kort beskrivning

UAB Enefit green is developing Kelmė Wind Farm (WF) in Kelmė District, Lithuania. Kelmė WF consist of three projects Kelme 1, Kelme 2 and Kelme 3. Here by we are announcing the cable line installation BoP tender for Kelme 2 and Kelme 3.

The scope of work for two Kelme WF projects:

Kelme 2 (UAB Vejoteka) 90 MW - 30 kV cable line
Kelme 3 (UAB Kelmės Vėjo Energija)150 MW - 30 kV cable line, 330 kV cable line

Scope  consist of:

  • Cable delivery
  • Protection pipe joins and all necessary components delivery.
  • Cable line detail design preparation.
  • Cable line detail design expertise.
  • Trench preparation, cable installation and all necessary works for cable line installation including trees and bushes cutting, drainage pipe removal and etc.
  • Drainage system restoration.
  • Road restoration in cases where the cable is installed under the road.
  • Land layers restoration in cases where the cable line is installed in agricultural land plots.
  • Take to account 5% of all cable line is installed by directional drilling method.
  • Cable line connection to WTGs and substation connection points.
  • All necessary test and measurements
  • All necessary documentation management with TSO (Litgrid)
  • All technical documentation in Lithuanian and English languages
  • Contractor responsible for final cable line commissioning according Lithuanian legislation

The Contractor must fulfill all the requirements of the technical projects and collect and submit all the necessary documentation. Completed work must fully comply with the requirements technical projects, legal acts and rules and standards in force in the Republic of Lithuania.

Please note that tender documentation will be constantly updated during the time. We ask all the participants to follow it up. Also questions are welcome via Mercell system.  
Please find the technical and legal documentation for contractors.

In case you have questions related with usage of Mercell system, please contact: vada@mercell.com

In case you have questions related to this procurement, please contact via Mercell system or via email: rokas.smilingis@enefitgreen.lt, ph +37065200165

Dokument (klicka på filnamnet för att ladda ner)

Namn Filstorlek
1 Kelme III - 30 kV cable specification.docx 60 KB
2 Kelme III - 330 kV cable specification.docx 89 KB
4 Kelme III preliminary cable line layout.pdf 17,64 MB
6 Kelme II - preliminary cable line layout.pdf 11,13 MB
7 Kelme II 30 kV cable line specification.docx 59 KB
Eesti Energia Groups´Code of Ethics for Partners.pdf 911 KB
Eesti Energia Occupational Health and Safety Requirements.pdf 84 KB
Instructions to Tenderers .docx 1,62 MB
Scope of works.docx 90 KB
Kelme 2 Kelme 3 preliminary time schedules.pdf 408 KB
Kelmė-2 90 SLD.pdf 293 KB
Kelmė-3 150MW SLD.pdf 458 KB
2023 05 10 Q&A.docx 18 KB
2023 05 16 - Q&A.docx 18 KB
D-U 90 MW.xls 24 KB
D-U 150 MW.xls 26 KB
Kelmė-2 -preliminary cable line sketch.dwg 9,08 MB
Kelmė-3 preliminary cable line sketch.dwg 604 KB
2023 05 30 - SLD-Kelme2+Kelme3.pdf 597 KB
2023 05 30 - Q&A.docx 100 KB
2023 05 30 - Q&A-2.doc 49 KB

Mercell Commerce

Del av Mercellgruppen, en av Europas ledande leverantörer av elektroniska upphandlings- och anbudssystem på den professionella marknaden.

Kontakta oss

Klicka här för att gå till vår support

+46 077 144 02 00
Mercell Commerce | Lindhagensgatan 94, 11218 Stockholm, Sverige