Anbudsfristen har passerat.
The Contracting Entity wants to pur-chase an insulation coordination study for the 150 kV Cable Project Han Herred – Thy-Mors-Salling. The insulation coordination study must include analysis of overvoltages due to faults and switching of high voltage equipment to overhead lines connecting to stations in the Han Herred – Thy-Mors-Salling project.