County Road 440. Upgrading of the Byhaug Tunnel

Information

02 - Meddelande om upphandling
Förhandlade förfaranden under konkurrens
2020-05-12 10:17 (GMT+02:00)
2020-06-16 12:00

Inköpare

Statens vegvesen Statens vegvesen
Cristopher James Cormack
Postboks 1010 Nordre Ål
2605 Lillehammer
Norge
971032081

Anbudsfristen har passerat.

Kort beskrivning

The northern exit of the Byhaug Tunnel shall be altered by 100 metres, of which 30 metres shall be considered as work for a new tunnel. From the tunnel portal at the north side an approximately 155 metres portal over the Eiganes Tunnel shall be constructed and led to the west side of the Eiganes Tunnel. The works include considerable terrain works, especially on the north side, as well as electrical installation works and trench works in the current tunnel. The Byhaug Tunnel is currently a one-way tunnel with a length of approx. 630 m. The Tunnel shall be upgraded in such a way that it is designed for an expected AADT (2035) of 13000.

Mercell Commerce

Del av Mercellgruppen, en av Europas ledande leverantörer av elektroniska upphandlings- och anbudssystem på den professionella marknaden.

Kontakta oss

Klicka här för att gå till vår support

+46 077 144 02 00
Mercell Commerce | Lindhagensgatan 94, 11218 Stockholm, Sverige