Approx. 1 200 metres of new Water and Sewage trenches shall be established The Water and Sewage system shall replace the current old Water and Sewage system. A new water main, ø 355, in PE and a new ø 200 sewer pipeline in PVC as well as storm water pipelines, partly 315 mm shall be established. The section of Fv61 shall be improved by the establishment of a new pavement and the implementation of some changes in the road's vertical alignment. The works for the improvement of the county road are executed by Stork Kommunalteknikk, on behalf of the Norwegian Public Roads Administration and Hordaland County. A water meter station shall also be established The water meter station shall be constructed as an in situ concrete structure.