The project ‘50149 Swimming Pool at Rud’ has been reviewed by Bergen municipality through feasibility studies and concept analyses for several alternatives.
In connection with the preparation of the turnkey contract basis, Bærum municipality would like to hold a dialogue conference with interested turnkey contractors to allow suppliers to influence the design and solution, so that as many as possible can participate in the competition.