The project consists of the renovation of two bridges. Both are cantilever bridges of 240 m.
This contract is mainly for mechanical repair, water chiselling, the delivery and assembly of installations for cathodic protection and spraying motar on damaged areas and anoednet.
In addition there will be the replacement of bridge equipment such as railings, joints, access equipment, renewal of the electrical installations as well as humidity insulation and a membrane on the bridge cover.
Detailed engineering design services for the solutions is also included.