Информация о тендере
Building inspections will be carried out on 430 properties along the route of the Lerstadt Tunnel. The condition of buildings and structures must be surveyed before construction work begins. The boundary of the survey is set at approximately 100m to either side of the route. Necessary inspections of properties after work on the tunnel is completed will be carried out at the request of the contracting authority. Subsidence levelling will also be carried out on some buildings.