Информация о тендере
The main works are the adaptations at the tunnel filling line in the receiving / pretreatment area where conveying and mixing systems are de-installed and replaced by different conveying equipment and some conveyors are adapted, as well as modification works at the old drum screen line and renovation of wind-sifting equipment at the new sieving line:
A.Replacement of equipment and modification at the tunnel filling line in the receiving / pretreatment area
B.Modification works at the old drum screen line
C.Renovation of wind-sifting equipment at the new sieving line
D.Replacement of equipment at the biowaste pretreatment line
Further detailed information is provided the tender request documentation.