In order to comply with future obligations regarding sewage services, IVAR must carry out measures on the existing sewage plant. It has therefore been decided that a new sewage line shall be constructed from Bråstein to Vik Treatment plant. The preliminary dimension for gravity sewer piping is maximum Ø800 and maximum Ø600 mm for pressure pipes, a total length of 13+9=22 km.
IVAR IKS requests tenders for preparing a preliminary project, preparing a zoning plan and detailed engineering design service for 5 pump station for all professions. Option for delivery of 1-2 additional pump stations. The detailed engineering design for the sewage line shall firstly be executed by IVAR. However, option for detailed engineering design services for the sewage line is also requested.
.