Assignment text
The Scope of Supply shall comprise of 2 pcs. 50MW electrode boilers for district heating. The supply is divided into the following main categories: - 2 pcs. 50MW boiler units complete - Pipe systems, components and instruments - High voltage cabinets - Low voltage cabinets - Control cabinets The Supply must be engineered, delivered, installed, cleaned, tested, commissioned and documented and be ready for commercial operation. When completed, the supply must be fit for the purposes for which the supply is intended as defined in the Tender Material.