Short description
Gas Storage Denmark plans a well operation in the natural gas salt cavern well To-8 for Q3 2023 at which the production string will be replaced. The anchor seal of the packer will be removed, and before installation of a new anchor seal assembly the seal area needs to be cleaned as good as possible. The project aims to gain knowledge about the tools on the market for this operation.