Assignment text
12-2200 Bømla Bridge and 12-2222 Storda Bridge shall not have their supporting cables dehumidified and
improvements made to the existing dehumidification installations. The assignment includes:
• delivery and assembly of dehumidification installations for stiffening supports and supporting cables for
Bømla Bridge and Storda Bridge
• replacement of the dehumidification installations for the side span on 12-2200 Bømla Bridge.
• post pulling of bolts in the upper suspension rod fastenings
• surface treatment on the upper suspension rod fastenings, stanchions, and cable clamps
• improvements to safety wires on main cables and assembly of wire based
fall protection system on the main cables.