Short description
The main aim of the improvements to national road 3 is to ensure an efficient, predictable, and safe main transport route for goods between Østlandet and Trøndelag. The contract is for engineering design services for and the construction of approx. 3.1 km improved and new national road 3 at Lonåsen, with a new bridge crossing over the Tunna river. Demolition of the existing Tunna bridge is included in the contract. The road line is in the development plan, which was approved on 27 October 2020. The entire stretch is in Tynset Municipality in Innlandet.