Short description
Micro-gas turbines shall be installed and commissioned at Fuglevik Treatment plant. The micro-gas turbines shall use bio-gas produced at the Treatment plant as engine fuel. The contractor is responsible for including all the required equipment for an operational and well-functioning plant.