Upgrading, 3 Tunnels in Årdal

Information

02 - Contract notice
Open procedure
10/25/2019 9:55 AM (GMT+02:00)
12/16/2019 12:00 PM

Buyer

Statens vegvesen region vest Statens vegvesen region vest
Sveinung Hovland Sveinung Hovland
Postboks 43
6861 Leikanger
Norway
971032081

Closing date has passed.

Short description

The Steggja tunnel is 1 549 metre long. A breakdown bay must be blasted with an accompanying niche for a technical building. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. The Finnsås tunnel is 2 412 metre long. 2 breakdown bays must be blasted with accompanying niches for technical buildings. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. The Kolnos tunnel is 658 metre long. A breakdown bay must be blasted with an accompanying niche for technical building. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps.

Mercell Holding AS

Part of the Mercell Group, one of Europe’s leading providers of e tender systems and information between buyers and suppliers in the professional market.

Contact us

Write to us

+47 21 01 88 00