Upgrading, 3 Tunnels in Årdal

Hankinnan yleistiedot

02 - Hankintailmoitus (2)
Avoin menettely
25.10.2019 10.55 (GMT+03:00)
16.12.2019 12.00

Hankintayksikkö

Statens vegvesen region vest Statens vegvesen region vest
Sveinung Hovland Sveinung Hovland
Postboks 43
6861 Leikanger
Norja
971032081

Määräaika on umpeutunut

Lyhyt kuvaus

The Steggja tunnel is 1 549 metre long. A breakdown bay must be blasted with an accompanying niche for a technical building. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. The Finnsås tunnel is 2 412 metre long. 2 breakdown bays must be blasted with accompanying niches for technical buildings. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps. The Kolnos tunnel is 658 metre long. A breakdown bay must be blasted with an accompanying niche for technical building. Trenches must be excavated on both side of the tunnel for electrical installations and a flushing water pipe with sand traps.

Mercell Suomi Oy

Osa Mercell-ryhmää, Euroopan johtavaa hankintapalvelujen sekä sähköisen kilpailutusjärjestelman tuottajaa.

Yleistä hankinnoista

Hankintalaki
TED

Yhteydenotto

Klikkaa tästä asiakaspalveluun

+358 207 528 600