RFI: Line 4 CHP plant

Informasjon

17.12.2018 14.38 (GMT+01:00)

Innkjøper

Fortum Oslo Varme AS Fortum Oslo Varme AS
Morten Lauritzen
Postboks 990, Skøyen
0247 Oslo
Norge
977 296 919

Kort beskrivelse

Fortum is seeking a waste to energy plant which meets the environmental expectations of the future, including carbon capture (CC). The plant must be suitable for the waste mix of the future. The plant should be a combined heat and power (CHP) where electrical production is maximized.

The scope and purpose of this RFI is for FOV to obtain more information in order to prepare for a possible procurement process for Line 4. FOV would like to determine:

-choice of technology

-maturity of carbon capture and storage solutions in the market place

-available emissions control features in the market place

-preferred compensation model

-the level of cost (CAPEX and OPEX) for budget purposes

-maintenance cycles and contents

-location of plant

-delivery and build time

More information attached to the notice on Doffin.no.

Filer (klikk på filnavn for å laste ned)

Tittel Størrelse
0_Request for information.pdf 793 KB
Appendix 1_Prelim SoW.pdf 514 KB
Appendix 2_Locations.pdf 291 KB

Mercell Norge AS

Del av Mercell-gruppen, en av Europas ledende leverandører av elektroniske anbudsverktøy og informasjon mellom innkjøpere og leverandører i det profesjonelle markedet.

Kontakt oss

Klikk her for å gå til support

+47 21 01 88 00