Dato for innlevering er passert
The objective of the procurement is to cover the need for a new main water pipeline from Skullerud water treatment plant to the distribution network in Eastern Oslo (Søndre Nordstrand). First and foremost this secures the supply in the area, but also provides possibilities for further expansion of the housing stock.
The initiative includes a 3.3. Km long conventionally driven tunnel, a 1 000 mm transmission line as well as other necessary installations.
The procurement comprises a turnkey contract where the turnkey contractor is responsible for the engineering design and execution. VAV [the water and sewage authority] has prepared a function description, as well as some drawings.