This notice is for a pre-qualification for turnkey contract M1, which comprises planning, engineering design services, delivery and assembly of technical machinery and process equipment for the treatment facility.
The tender contest involves:
A turnkey contract for the delivery and installation of mechanical and process technical equipment for a new main sewage treatment plant HRA Storanpia.
The plant shall be a sieving plant that shall be dimensioned for 40 000 PE.
The purification requirement is primary purification, with the following requirements in the discharge permit:
— 20 reduction of biological oxygen consumption (BOF5) or maximum 40 mg O2/l;
— 50 % reduction of suspended matter (SS) or maximum 60 mg SS/l.
Further details are described in the pre-qualification documentation.