Ground Work for Fornebu Station and Base

Informasjon

05 - Kunngjøring - forsyningssektoren
Konkurranse med forhandling
23.01.2020 09.49 (GMT+01:00)
28.02.2020 12.00

Innkjøper

Oslo Kommune v/Fornebubanen Oslo Kommune v/Fornebubanen
Gunnar Gjellan
Rådhuset
0037 Oslo
Norge
818379862

Dato for innlevering er passert

Kort beskrivelse

The Fornebu Railway will be a new underground stretch in a connected tunnel system from Majorstuen in Oslo to Fornebu in Bærum. The railway will be approx. 8 km long with 6 stations: Fornebu, Flytårnet, Fornebuporten, Lysaker, Vækerø and Skøyen. Most of the work under this contract will be: — demolishing the existing buildings at Fornebu south, a total of approx. 75 000 m — clearing the building matter, loading, transport and disposal at a certified site, — excavating and blasting a construction pit, approx. 600 000 fm — sheet piling and securing, injection for a sealed construction pit, — loading, transport and disposal of lightly polluted (classes 2 and 3) uncompacted matter at a certified site, — loading, transport and disposal of blasted stone at a certified site.

Mercell Norge AS

Del av Mercell-gruppen, en av Europas ledende leverandører av elektroniske anbudsverktøy og informasjon mellom innkjøpere og leverandører i det profesjonelle markedet.

Kontakt oss

Klikk her for å gå til support

+47 21 01 88 00