Piedāvājumu iesniegšanas termiņš ir beidzies.
In order to secure the water supply from the Jær pipeline to Hå municipality in times of interruptions to delivery from IVAR's water supply facility at Langevatn, an elevated basin of 20 000 m3 shall be constructed. The basin is to be located high enough to provide the required pressure without pressure reinforcement.
Piesakieties Mercell un saņemiet paziņojumus par jaunākajiem iepirkumiem sev svarīgajās nozarēs 7 dienas bez maksas!