This project shall include delivery of guided signs and necessary infrastructure for signs.
The Ulven Intersection of the E6 has two (2) existing traffic portals with fixed road signs. These shall be replaced with guided signs and The Norwegian Public Roads Administration wants tender offers on the delivery, assembly and on the associated works.
Scope of works:
— 2 mechanical variable signs;
— Disassembly of the existing signs;
— 2 SSA cabinet with cables between the sign and cabinet, electricity supply from Hafslund;
— Approx. 590 m of ditch excavation, four (4) manholes, approx. 590 m cable conduit 110 mm, approx. 510 m, 3x40 DL cable conduit, approx. 590 m search wire;
— Approx. 710 m fibre cable from Ulven/Sinsen tunnel with termination;
— Equipment testing, FAT and SAT;
— AOM documentation, obstacle works, meeting participation, coordination, progress planning, etc.
The above scope is informative. Exact quantities are stated in chapter D.