Piedāvājumu iesniegšanas termiņš ir beidzies.
The Contracting Authority puts out to 1 The liquefaction set-up should contain an intermediate low-pressure storage (called low gas permeability bag), gas purifier (purifier), compressor (high pressure compressor), and helium liquefier (liquefier). The set-up should be connected to the helium gas outlet of the Bruker 950 MHz magnet and have the possibility to connect other helium gas sources.
Piesakieties Mercell un saņemiet paziņojumus par jaunākajiem iepirkumiem sev svarīgajās nozarēs 7 dienas bez maksas!