Pasiūlymų pateikimo terminas praėjo.
The Danish Defence Acquisition and Logistics Organisation (DALO) wishes to replace the existing Instrument Landing Systems at Airbase Karup / Midtjylland airport (EKKA) with two new Instrument Landing Systems. The existing Instrument Landing Systems – runway (RWY) 27L (CAT II) and RWY 09R (CAT I) were installed and commissioned in about 1977/87. This purchase concerns the replace of these two Instrument Landing Systems. All other prerequisites for existing CAT II and CAT I operations will be retained.