Pasiūlymų pateikimo terminas praėjo.
E134 shall be altered between Gvammen and Århus, a stretch of approximately 12 km including the 9.4 km long Mælefjell tunnel.
The work consists of:
Delivery and assembly of electrotechnical installations, including CRM (control, regulation and monitoring).