A new transmission pipeline is to be established from the exit at Løpshavn to the exit at the golf course at Myklebostad. A new supply pipeline shall be laid parallel with the transmission pipeline from Løp to Myklebostad. Private interceptor water supply installations are to be connected to the supply pipeline. A pressure reducing water pond is to be established after the exit to Geitvågen. Water is to be taken from the transmission pipeline via pressure reduction and into the supply pipeline. Renovation of roads and open spaces that are affected by the ditch works.
The project's nature and extent:
Ditch for water and sewage installations, approx. 4750 m
approx. 4900 m transmission pipeline, Ø 225 mm
approx. 4100 m supply pipeline, Ø 110 mm
approx. 1460 m surface water pipeline, Ø 160-200 mm
12 items water ponds
3 units gravity water pond
1 unit pressure reduction water pond with water meters
Renovation of existing roads after the ditch works have been completed, approx. 1280 m2
approx. 250 m service pipes
Transportation of excavated matter approx. 5000 m3