Method study for railway overbuild at Ny Ellebjerg

Hange

101 - Kaubad ja teenused väärtuses
Piiratud menetlus
02.10.2018 14:59 (GMT+03:00)
22.10.2018 11:00 (GMT+03:00)

Hankija

METROSELSKABET I/S METROSELSKABET I/S
Carsten Larsen Carsten Larsen
Metrovej 5
2300 København S
Taani
30823699

Hange on lõppenud

Hanke lühikirjeldus

October 2016 the Owners of Metroselskabet decided to relocate the planned metro station at Ny Ellebjerg to a position underground north of the S-train tracks and to study the possibilities for development of housing, office and retail above the railway tracks.

The intentions behind the change were to create better facilities for passengers changing between existing lines at Ny Ellebjerg, as well as better optional facility to continue the metro line towards Hvidovre and Bispebjerg.

The method study is intended to illustrate generic construction method solutions for the specific site at Ny Ellebjerg. The generic solutions will, with a view to opportunity, railway impact, costs and time, be applied in the further planning of the over site development.

More information is available in the Tender Document “Project and Work Description”.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti