Hanke lühikirjeldus
The contract comprises 85 sewage pump stations and 39 water pump stations/elevated basins.
The individual stations shall be inspected at 3 year intervals, this means that annual approx. 30 sewage pump stations and approx. 13 water pump stations/elevated basins shall be inspected.
Reconstruction of automation etc. at approx. 4 to 6 stations a year and upgrading with new light fixtures, cabinets etc. at up to 2 stations per year.