Turnkey contract substructure SMS 2A

Hange

Läbirääkimistega menetlus
15.02.2018 10:19 (GMT+02:00)
15.03.2018 12:00

Hankija

Bane NOR SF Bane NOR SF
Kjell-Gunnar Braathen Kjell-Gunnar Braathen
Biskop Gunnerus' gate 14
0185 Oslo
Norra
917 082 308

Hange on lõppenud

Hanke lühikirjeldus

The project New Double Track Sandbukta-Moss-Såstad (SMS) is part of the Intercity development and one of the lots in the link to Halden (the Østfold railway´s western line). A new double track shall be constructed on the stretch, which partly lies in tunnels and partly in the open air, as well as a new railway station at Moss. The new station shall be built in the open air, approx. 200 m south of the current station. Four tracks are planned, as well as a branch to the harbour track for Moss harbour.

The Sandbukta-Moss-Såstad stretch is approx. 10.3 km long and it consists of three open air zones and two tunnels of 2720 m (including a 420 m concrete culvert) and 2350 m (including a 200 m concrete culvert) respectively. Turnkey contract substructure SMS 2A includes all deliveries and activities that are necessary for the execution of the contract, in accordance with the tender documentation.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti