The contracting authority shall enter into framework agreements that cover graphic design and printing information material. The competition is divided into 2 lots:
— Lot 1 Graphic design,
— Lot 2 Printing information material.
Each lot will be evaluated separately. Based on this, the contracting authority can end up with 1 or 2 tenderers in the contract period.