Rv 150 Ullevål junction New foot and cycle bridges.

Hange

Avatud menetlus
27.06.2017 10:54 (GMT+03:00)
21.08.2017 12:00

Hankija

Statens vegvesen Region øst Statens vegvesen Region øst
Magne Vikne Magne Vikne
Postboks 1010
2605 Lillehammer
Norra
971 032 081

Hange on lõppenud

Hanke lühikirjeldus

The Norwegian Public Roads Administration, Eastern Region, shall construct new foot and cycle bridges at the Ullevål junction, as well as develop a new Sognsvei from Rv 150 Ring 3 up to and including the roundabout by the underground.

The existing footpath between the north and south side of Ring 3 at Sognsveien shall be maintained during the entire construction period.

The foot and cycle paths shall be altered and connected to the existing foot and cycle paths. 3 new permanent stops shall be developed, as well as a temporary stop.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti