Thermodynamic software solution for offline Static Process Modelling and online Optimisation of Combined Heat and Power.

Hange

Läbirääkimistega menetlus
04.05.2015 14:20 (GMT+03:00)
15.05.2015 14:00

Hankija

DONG Energy Thermal Power A/S DONG Energy Thermal Power A/S
DONG Energy Thermal Power A/S DONG Energy Thermal Power A/S
Jens Vollertzen Jens Vollertzen
Kraftværksvej 53
7000 Fredericia
Taani
CVR no. 27446469

Hange on lõppenud

Hanke lühikirjeldus

DONG Energy Thermal Power A/S is planning to replace its existing tools for offline static process modelling and online optimisation of the thermodynamic processes in its thermal power plants. The contract is expected to include the following services:

1) Software Solution for offline static process modelling and online optimisation of combined heat and power plants including:

— Licences;

— Relevant documentation and education for operation, maintenance and development;

2) Installation, configuration and test of software solution including:

— Installation on DONG Energy servers;

— Configuration of interfaces to relevant DONG Energy servers including central Wonderware IN_SQL for production data for all units;

— Relevant documentation and education for operation, maintenance and development;

3) Configuration and test of the solution on the AVV2 unit on the power plant Avedoereværket near Copenhagen. The activity includes:

— Offline: Full As-Design and As-Is models of the unit including boiler, turbine, biomass fired boiler and gasturbines. Calibration to relevant data (heat balances etc.). Modelling of relevant regulations principles;

— Online: Performance Monitoring of relevant KPIs, KPI Optimal Fuel Calculation based on As-Is Model, Online PQ charting and data exporting facility based on current boundary conditions;

— Relevant documentation and education for operation, maintenance and development;

— Online Performance Reporting functionality;

— Online Component Monitoring Pages;

— Data validation according to VDI2048;

4) Configuration and test of remaining 6 power plants throughout Denmark.

5) Training after which DONG Energy should be able to do the implementation on the units they choose to implement.

6) Portfolio overview pages of plant performance.

The supplier is expected to deliver relevant project management.

The implementation of the above services is expected to be finalised within 9-12 months. The implementation of the remaining 6 units is expected within additional 18-24 months.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti