The Scope of work for COBRAcable VSC Converter includes design, execution and completion of the following:
— HVDC-VSC Converter substation in Eemshaven, The Netherlands,
— HVDC-VSC Converter substation in Endrup, Denmark.
The transfer capability for the COBRAcable VSC Converter Plant shall be 700 MW at +/- 320 kV DC with reference to IEC TR 62543:2013 Ed. 1.1 High-voltage direct current (HVDC) power transmission using voltage sourced converters (VSC).