Water supply the North Side – Stage 3.

Hange

Avatud menetlus
04.04.2014 5:34 (GMT+03:00)
13.06.2014 12:00

Hankija

Bodø kommune Byteknikk974790947 Bodø kommune Byteknikk974790947
Jan Henrik Henriksen
Gjerdåsveien 2 (Herredshuset), Postboks 319
8001 Bodø
Norra

Hange on lõppenud

Hanke lühikirjeldus

A new transmission pipeline is to be established from the exit at the golf club at Myklebostad to the planned valve basin (stage 4) at Skaug. A new supply pipeline shall be laid parallel to the transmission pipeline. Private interceptor water supply installations are to be connected to the supply pipeline. A pressure reducing basin is to be established at Skjelstad Water is to be taken from the transmission pipeline via pressure reduction and into the supply pipeline. County road 834 crosses at Skjelstad with the supply pipes being pressed. Renovation of roads and open spaces that are affected by the ditch works.

The project's nature and extent:

— Ditch for water and sewage installations, approx. 5 970 m

— approx. 5 965 m transmission pipeline, Ø 225-180 mm

— approx. 5 965 m supply pipeline, Ø 110-180 mm

— approx. 130 m surface water pipeline, Ø 160 mm

— approx. 1 460 m surface water pipeline, Ø 160-200 mm

— 20 water ponds

— 6 units of gravity water pond

— 1 unit pressure reduction water pond with water meters

— Pipe pressing through county road 834, approx. 16 m

— Renovation of existing roads after the ditch works have been completed, approx. 1 280 m2

— Renovation of existing pavement/footpath from Kløkstad to Skaug after the ditch works are completed approx. 1 500 m2.

— approx. 45 m service lines

— Transportation of excavated matter approx. 7 000 m3

The total length of the transmission pipeline is approx. 5 965 meter.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti