Construction of substations for Kelme 2 and Kelme 3 Wind farm projects

Hange

06.06.2023 15:11 (GMT+03:00)
16.06.2023 23:00 (GMT+03:00)
12.06.2023 12:00 (GMT+03:00)
12.06.2023 12:00 (GMT+03:00)
Ei
Ei

Hankija

Enefit Green UAB Enefit Green UAB
Andrius Venckūnas Amanda Nagevičiūtė
Olimpiečių g. 1-40
LT-09235 Vilnius
Leedu
305039259

Hange on lõppenud

Hanke lühikirjeldus

UAB Enefit green is developing Kelmė Wind Farm (WF) in Kelmė District, Lithuania. Kelmė WF consist of three projects Kelme 1, Kelme2 and Kelme 3. Here by we are announcing the substation BoP tender for Kelme 2 and Kelme 3.

The scope of work for two Kelme WF projects:

Kelme 2 (UAB Vejoteka) 90 MW - 330/30 kV substation
Kelme 3 (UAB Kelmės Vėjo Energija)150 MW - 330/30 kV

Scope for BoP substation part consist of:

  • Substation detail design.
  • Substation detail design expertise
  • Substation construction
  • Land plot preparations for construction
  • Full construction works, from foundations to the key.
  • Transformer, shunt reactors components and all other necessary equipment delivery.
  • Substation assembly / installation.
  • Cameras, security system, communication systems and all other additional equipment installation.
  • Substation energization
  • Organising all necessary tests and measurements
  • All necessary documentation management with TSO (Litgrid)
  • All technical documentation in Lithuanian and English languages
  • Contractor responsible for final cable line commissioning according Lithuanian legislation


The Contractor must fulfill all the requirements of the technical projects and collect and submit all the necessary documentation. Completed work must fully comply with the requirements technical projects, legal acts and rules and standards in force in the Republic of Lithuania.

Please note that tender documentation will be constantly updated during the time. We ask all the participants to follow it up. Also questions are welcome via Mercell system.  
Please find the technical and legal documentation for contractors.

In case you have questions related with usage of Mercell system, please contact: vada@mercell.com

In case you have questions related to this procurement, please contact via Mercell system or via email: rokas.smilingis@enefitgreen.lt, ph +37065200165

Hankele lisatud dokumendid

Dokumendi nimi Faili suurus
1 Kelme II 330 kV -TECHNICAL SPECIFICATIONS FOR ESSENTIAL REQUIREMENTS OF MAIN PLANTS.docm 586 KB
2 Kelme II power transformer specification 330-30 kV TS.docx 427 KB
3 Kelme II colosed switch yard 30 kV grouning reactor.docx 103 KB
4 Kelme II - connection scheme.pdf 293 KB
5 Kelme II - preliminary cable line layout.pdf 11,13 MB
6 Kelme III power transformer specification 330-30 kV TS.docx 427 KB
7 Kelme III - connection scheme.pdf 457 KB
8 Kelme III preliminary cable line layout.pdf 17,64 MB
9 Kelme III 330 kV ─ TECHNICAL SPECIFICATIONS FOR ESSENTIAL REQUIREMENTS OF MAIN PLANTS, EQ.docm 589 KB
10 Kelme III 330kV Shunt reactor specification.docx 75 KB
Eesti Energia Groups´Code of Ethics for Partners.pdf 911 KB
Eesti Energia Occupational Health and Safety Requirements.pdf 84 KB
Instructions to Tenderers.docx 1,59 MB
Scope of works.docx 88 KB
2023 05 16 - Q&A.docx 16 KB
2023 06 06 - Q&A-Substations.docx 14 KB

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti