Engineering, Procurement and Construction of Northern Lights Onshore Plant at ‘Naturgassparken’ in Øygarden for Import and Storage of CO2

Hange

03 - Contract award notice
Competitive procedure with negotiation
22.01.2021 11:47 (GMT+02:00)

Hankija

Equinor ASA Equinor ASA
Hilde Borgen
Forusbeen 50
4035 Stavanger
Norra
923609016

Eesmärk

The NL project is part of the Norwegian full-scale CCS project and based on Gassnova SF’s design basis with transport and storage of an annual volume of 1.5Mt/y CO2. NL will receive liquid CO2 from Fortum Oslo Varme's energy recovery plant (Klemetsrud) and Norcem's cement factory (Brevik). Unallocated capacity will be made available for CO2 from other national and international capture sites. NL comprises ship transport of liquefied CO2 from the industrial capture sites, an onshore plant for receipt and temporary storage of liquefied CO2 from ships, export of CO2 through an offshore pipeline, and injection and permanent storage in a reservoir under the seabed on the Norwegian Continental Shelf. The Onshore Plant at Naturgassparken in Øygarden will temporarily store liquid CO2 in storage vessels in the immediate vicinity of a new import quay. The liquid CO2 will be pumped from the storage vessels through an offshore pipeline to an injection well offshore https://northernlightsccs.com/

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti