Hanke lühikirjeldus
Energinet is building a new Gas pipeline and compressor station called Baltic Pipe connecting the Europipe II in the North Sea with the Polish gas network including a new compressor station at Everdrup.
Due to this new project the amount of gas transported in the Danish gas system will increase dramatically and the IT solutions for handling the markets, the operational planning and other related IT systems needs to be revised or replaced.
The objective of this RFI is to identify which possible solutions exist on the market for solving the three areas described in the appendix A, B and C (see below).
The market dialogue contents following documents (which can be downloaded in EU-Supply):
• Market dialogue based request for information;
• About Energinet;
• Appendix A: Market system;
• Appendix B: Planning system for system operation;
• Appendix C: Logging system for control center gas.