Fv. 53 Ljoteli — landslide Protection

Hange

03 - Contract award notice
Avatud menetlus
17.10.2019 10:43 (GMT+03:00)

Hankija

Statens vegvesen Region vest Statens vegvesen Region vest
Jørn Fosen Simonsen Jørn Fosen Simonsen
Askedalen
6863 Leikanger
Norra
971032081

Eesmärk

County Road 53 between Øvre Årdal and Holsbru, on the stretch Årdal – Tyin. The project is divided into 3 geographical areas. Ljoteli with tunnel and open air zones, landfill areas at Holsbru and a smaller landfill at Holsbruvannet. A 1,100 m long tunnel will be constructed (T8.5 + sight expansion), as well as cuttings and transition zones. The assignment also includes complete electrical works in the tunnel. At Holsbru (2,5 – 3,0 km over Ljoteli) approx. 600 m of open air road will be constructed, with cross section 6,5 m + ‘crawler lane’, Sa3. From Holsbru and toward Holsbruvatnet, a 400 m long ditch will be established along the existing roads. The assignment will primarily be implemented model based.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti