Fv. [County Road] 213 Skiftesvik-Marikoven — Contract

Hange

02 - Contract notice
Avatud menetlus
21.06.2019 10:49 (GMT+03:00)
28.06.2019 12:00

Hankija

Statens vegvesen Statens vegvesen
Isabelle Nilsen
Postboks 6706 Etterstad
0609 Oslo
Norra
971 032 081

Hange on lõppenud

Hanke lühikirjeldus

The work consists of improving the current county road 213 from Skiftesvik to the turning place at Marikoven, a route of approx. 1,4 km. The road is to be expanded into the rock cutting past 'Kvitaneset' between approx. pile 1 500 and approx. pile 1 620. At its highest, the rock cutting is approx. 30 m, and there are big challenges as regards both site engineering and traffic flow when blasting down the rock cutting. We see this blasting as a critical activity. A new bridge is also to be established by the side of the existing bridge at Pøylo, which will end in a new roundabout. A closed surface water system is to be established together with water and sewage installations for Askøy Municipality along the county road, and new lighting installations are also to be established. The project will be carried out based on drawings.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti