Hanke nimetus: Fiber recovery system rebuild from pulpers to BM1 headbox
Viitenumber: 204674
Hanke lühikirjeldus: To improve energy efficiency of electricity in FRS (fiber recovery system) by at least 17% per ton. (energy consumption of the FRS from the 1st pulper to headbox). To increase the productivity from current maximum pulping capacity of 2t/h to a minimum capacity of 2,7 t/h (100% dry output) for the preparation of recovered fiber stock. To increase the purity of the light rejects (current fiber content in light reject: 15-25%). To increase the effectiveness of light reject removal from the pulpers. To decrease light reject water content (current water content 65%). To enable head box stock flow to up to 6000 l/min at 0,9 % consistency. To ensure that the offer meets appropriate technical specifications.
Võitja: PR Pulping Oy (PR Pulping Oy) (PR Pulping Oy)
Summa: 237 900 eurot
Lepingu sõlmimise kuupäev: 19.03.2019 00:00
Hankija: Räpina Paberivabrik AS, 10149813
Kontaktisik: MIHKEL PEEDIMAA
Email: mihkel@rappin.ee Hankemenetluse liik: Toetuse saaja ost
Link dokumentidele: https://riigihanked.riik.ee/rhr-web/#/procurement/1545238Link teatele: https://riigihanked.riik.ee/rhr-web/#/procurement/1545238/notices/notice/1628013/print